TOTAL STATION
LEICA TCRA1101PLUS
LEICA
TCA1800
NIKON (DTM800/850/821/750)
PENTAX
(ATS 102/103)
TOPCON (GTS 211/220/230/)
SOKKIA
NIKON
COMPUTER EXPERIENCE
MS Office
Auto Cad 2000 /14
(Knowledge of Conversion to Cad of Site Data & Making Drawing)
Downloading
Data from Total-Station & Digital level to PC (Computer )
Uploading
from PC(Computer) to Total Station
Working
knowledge in Surveying Software’s, Leica Survey Office, Leica Level Pak, Nikon Transit, Pentax, Ultra Edit 32
TOTAL EXPERIENCE “ 7.9 YEARS
“ IN CONSTRUCTION FIELD
FROM July 2005 TO July2006
PROJECT
Discovery Garden Mediterion
2B, Dubai
Al Salam Investment
Park
CLIENT
M/S
Nakheel
M/S Al Salam Industustrial
EMPLOYER
M/S-
Ghantoot Gulf
Contracting,P O Box – 34765, Bur Dubai. UAE
POSITION HELD
Land Surveyor
DESCRIPTION OF DUTIES
Traversing & Triangulation Survey
All Setting Out For Building & Road Work.Earth Quantity Calculation Handel the Survey Team for construction site.Demarcation
for new construction site in See at Palm Beach area.Bolt Fixing for Steel Column with (+,-) 3mm accuracy 15M Steel Column Verticality checking
& maintained with as per design requirement. Utility (Drainage, Storm water, Telephone, Electric)
Manhole lay out & Slope maintained with Dubai Municipality approval Boundary Wall Fixing & Checking &
approval from Dubai Municipality
FROM October 2002 TO June 2005
PROJECT
Metro
Corridor Contract MC1B Delhi
DELHI
METRO RAIL CORPORATION LTD.
EMPLOYER
International Metro Civil Contractors
(Dywidag – L&T – Samsung – Ircon – Shimizu JV)
POSITION HELD
Surveyor
DESCRIPTION OF DUTIES
NATM (New Austrian Tunneling
Method) Survey.
Traversing, check of profile, setting out of tunnel centreline and spring
line, track centreline, walkway, setting out of concrete formwork and shutter, motorized laser tunnel guidance systems (VMT
GmbH), fixed laser tunnel guidance systems, wriggle survey, Manual Survey of TBM/EPBM
Lay out of Two (Up & Down) Platform Tunnel (Up Line Length 275 to
325M & Down Line Length – 275 to 325M) & Nine Cross Passages Between Up & Down Platform Tunnel for Gang
Way For That Laser Fixing Pipe Roofing point marking, Lattice Girder Profile Checking
Laser Fixing For Tunnel Alignment & Lattice Girder
Profile Checking of Lattice Girder
Guide wall, Diaphragm wall Panel Layout.
Soft panel, Traverse, Triangulation.
3D Monitoring of Tunnel Nearest Building & Surface Line
Set out Monitoring for Building and Surface line.
Fixing for Tunnel Alignment.
Fixing of Pile Center point.
As built of under ground Utilities
(OFC Cable, Water line, Sewer Line etc.)
Tunnel Decking Layout.
Lay out of King post.
Verticality Checking of 25M Beams
Tunnel Profile Marking
Column Shaft Verticality Checking of 30M Height
Shaft (Column) Center Transfer up to 30 M Below Ground
Download & Upload Survey data & Made
Drawing in Auto Cad
PERFORMANCE AWARD
I
have Been awarded the Merit of Certificate for my Excellent Performance during the Execution of Diaphragm
wall work at most Critical Metro Rail Station in the Asian continent at Houz Qazi chowk, Chawri Bazar, New Delhi for Delhi
Metro Rail Corporation.
FROM February 2002 TO October 2002
PROJECT
Metro
Corridor Contract MC1B Delhi
DELHI METRO RAIL
CORPORATION LTD
EMPLOYER
Sai
Engineers,E 12 Lane No 05,Pandav Nagar Delhi 91
POSITION HELD
Surveyor
WORK FOR
International Metro Civil Contractors
(Dywidag – L&T – Samsung – Ircon –
Shimizu JV)
DESCRIPTION OF DUTIES
Guide wall, Diaphragm wall Panel Layout.
Soft panel, Traverse, Triangulation.
3D Monitoring of Tunnel Nearest Building & Surface Line
Set out Monitoring for Building and Surface line.
Fixing for Tunnel Alignment.
Fixing of pile point.
As built of under ground Utilities
(OFC Cable, Water line, Sewer Line etc.)
Tunnel Decking Layout.
Lay out of King post.
Verticality Checking of 25M Beams
Tunnel Profile Marking
Column Shaft Verticality Checking of 30M Height
Shaft Center Transfer up to 30 M Depth
FROM November
2001 TO February 2002
PROJECT
PETRONET L.N.G. TARMINAL DAHEJ . GUJRAT
EMPLOYER
Zenith
Consultant
P 33/B,IAF, Lohagaon
Pune – 32,Phone – (020) 6688088
WORK FOR
IHI Ishikawajima-Harima Heavy
Industries Co.,Ltd
POSITION HELD
Sr. Surveyor
DESCRIPTION OF DUTIES
Locate the Tank center of Tank –101, Tank –102
Checking of “Embedded Plate” Every 3.75degree up to +/-3mm accuracy.
Insert Plate Fixing of Staircase.
Checking of “Tank wall verticality” Every 3.75degree up to +/-3mm accuracy.
Lay out of the pipe support of connected to tank area.
Lay out of the Concrete Road
surrounding Tank area.
FROM October
2001 TO November 2001
PROJECT
DAHEJ TO HAJIRA GAS PIPELINE PROJECT , DAHEJ
EMPLOYER
Zenith
Consultant
P 33/B,IAF, Lohagaon
Pune – 32, Phone – (020) 6688088
CLIENT
INDIAN PETROCHEMICAL CORPORATION LIMITED
WORK FOR
DODSAL PRIVATE LIMITED
POSITION HELD
Sr. Surveyor
DESCRIPTION OF DUTIES
30 Km Alignment marking of Pipeline from Hajira to Dahej.
Area calculated for “Right of Use” department.
Joint Measurements of Pipe Line Area with Local
Land Owner.
FROM January
2001 TO October 2001
PROJECT
RELIANCE
TELECOMUNICATION
EMPLOYER
Zenith
Consultant
P 33/B,IAF, Lohagaon
Pune – 32,Phone – (020) 6688088
WORK FOR
RELIANCE ENGINEERING ASSOCIATES PVT. LTD. MUMBAI
POSITION HELD
Surveyor
DESCRIPTION OF DUTIES
Topographical survey of Mumbai city major & minor road with total station
Prepared as-built drawing of Road, Drain, Electric poles, Buildings etc. To develop routings of Fiber
Cables in Mumbai city.
Topographical survey of Pune city major & minor road with total station.
Prepare as-built drawing of Road, Drain, Electric poles, Buildings etc. To develop routings of Fiber
Cables in Pune city.
FROM September
1998 TO January 2001
PROJECT
DABHOL POWER PROJECT. ANJANWEL
GUHAGAR, MAHARASHTRA (ENRON PROJECT)
EMPLOYER
Zenith
Consultant
P 33/B,IAF, Lohagaon
Pune – 32, Phone – (020) 6688088
WORK
FOR
Larsen & Toubro
Ltd. ECC Group
Punj Lloyd Ltd
Dabhol Power Company (ENRON)
Petron Engineering Ltd
POSITION HELD
Surveyor
DESCRIPTION OF DUTIES
Work involving topographical survey of command area for Earthwork Quantity.
As
built of under & aboveground permanent & temporary construction utilities.
Construction
setting out for CTG (Combustion Turbine Generator) STG (Steam Turbine Generator)
HRSG, 100 M Stack, Cooling Towers, Pump House, Intake Structure, WTP, and 400KW Switch yard Tank Farms, Cross Country pipe
line, Construction jetty, Housing Colony. Labour Colony Haul Road
& other major civil Foundation
Fixing of anchor Bolts up to +/-3mm accuracy
Checking
Verticality of 32 M columns & 100m Stacks,
MS plate fixing up to +/-0.1mm accuracy with reference to technical specification.
Benchmark connection, Monitoring of heavy Concrete foundation, various slope excavation work checking rough & finish
grading work.
Two
peg test & calibration of auto level
PERFORMANCE AWARD
I have been awarded for my Outstanding Performance in
Dabhol Power Project Phase -II for Safety, Quality & Productivity in 2001
----------------------------------------------------------------------------------------------
PERSONAL DETAILS
NAME
MAHESH
VITTHAL PANCHAL
DATE
OF BIRTH
09 May 1981
NATIONALITY
Indian
MARITAL
STATUS
Unmarried
PASSPORT NO
F1412818
TECHNICAL
QUALIFICAITON
Surveying in Govt.
of India’s Technical Industrial
Training Institute
from (91%), Pune, Maharashtra
LANGUAGE
& DEGREE
OF
PROFICIENCY
Language Read Write Speak
English good
good good
Hindi fluent fluent fluent
Marath fluent
fluent fluent
EMAIL
ADDRESSES
mahesh_surveyor@rediffmail.com
mahesh_surveyor@yahoo.com
maheshvpanchal@gmail.com
PRESENT
ADDRESS
Bhairavanath Temple,
At post Manchar,
Tal Ambegoan
Dist Pune. Maharashtra
India.
Cell :- +91-9960496767
PERMANENT
ADDRESS
Bhairavanath Temple,
At post Manchar,
Tal Ambegoan
Dist Pune. Maharashtra
India.
Cell :- +91-9870070182,
+91-9930261222+91-9890035011